The 2022 bond is funding a new synthetic turf field and a new track at Sylvester Middle School. New additions to the plan include a soccer mini-pitch donated by the Seattle Sounders/RAVE Foundation and a grant-funded modular restroom building.
The project was initially estimated to be completed this summer. Due to the added features and increased environmental requirements to protect Miller Creek, the timeline is being extended to next summer 2024.
Sylvester Field Improvements Site Plan: This is the proposed site plan showing a synthetic turf field in the same location as the existing field, with markings for soccer, football, long jump and high jump, as well as new track lane surfaces. The plan includes a soccer mini-pitch donated by Seattle Sounders/RAVE Foundation and a permanent restroom building funded with a grant from the Washington State Department of Commerce.
The mini-pitch and the restroom are shown on this site plan to be located at the southwest corner of the field, in the space between existing portable classroom buildings.