Menu

Highline Public Schools
15675 Ambaum Blvd. SW Burien, WA 98166

Office Hours:

Monday-Friday: 7:30 a.m. - 4:30 p.m.

Highline Public Schools
15675 Ambaum Blvd. SW Burien, WA 98166

You Are About To Leave the Highline Public Schools Website

You are now leaving the Highline website and will be redirected to a third-party application or website. This site may have advertisements or other content not necessarily endorsed or approved by Highline Public Schools. 

Tyee Teachers Settle in & Prepare for Students

Tyee Teachers Settle in & Prepare for Students
A modern brick building labeled %22TYEE HIGH SCHOOL%22 with a covered walkway and benches in the foreground is set against a clear blue sky.

New Tyee High School Opens its Doors to a New Era

Staff are moving into the new Tyee High School and are excited to welcome students on Titan Day, September 2, and the first day of school, September 3. This 2022 school bond project is on time and on budget.

Furnishing a New Facility

New desks and chairs and the school's Promethean panels were waiting in classrooms to support student learning from math and language arts to environmental studies and health sciences.

A polished wooden basketball court with a red and gold logo in the foreground is set against a backdrop of red bleachers displaying large gold letters and a gymnasium wall.

Gym floors are striped in Tyee colors and the Tyee Titan's athletic logo.


A gray band saw sits in the foreground, with a wooden-paneled wall and a glass door featuring a red shield emblem in the background.

Machines used in the Core Plus Construction program were arriving for the wood shop.


 

Two women are talking in a classroom with desks and chairs stacked in the background.

In her new classroom, Teacher Antje Brewer (right) talks to another Tyee staff member.


Teacher Antje Brewer was especially impressed by the school’s sustainable features, like repurposed wood gym floors now lining the walls outside the new gym. Antje said she appreciated that concrete from the original Tyee was recycled on site as base material under the new school.

Wood glu-lam beams from the original school were installed in the roof deck of the new library. On the roof, a 75-kilowatt solar panel installation will help supply power.

A geothermal loop buried under the new athletic field (240 wells that each descend 350 feet below the field) connects to an electric pump with supply and return pipes, to heat or cool the new building. 

Next Steps

Crews are hard at work finishing details on a punch list, including the central courtyard and field landscaping, final cleaning inside, and the paving of the main driveway from South 188th Street.  

A community grand opening is being planned for October. More information will be shared soon.

More Photos

Workers in hard hats and safety vests are busy on a construction site with a white truck in the foreground and a dark modern building in the background.

Crews work to complete the central courtyard landscaping design.


A commercial kitchen with stainless steel serving stations in the foreground and rows of industrial refrigerators and ovens in the background.

Photo of Tyee kitchen food servery.


Two men assemble furniture on the floor in front of a large wooden staircase, while a woman stands nearby with a white panel.

Crew members assembling furniture in the Tyee commons by the large learning stair.


A freshly laid green football field with construction materials in the foreground is bordered by a fence and surrounded by trees and houses in the background.

View of new Tyee athletic field and track.


Two smiling women sit at a desk with a laptop in front of a wall displaying %22TYEE HIGH SCHOOL.%22

Two staff members work in front of a large scale Tyee High School shield logo in the front office.


A red chair and table are in the foreground, with a modern, open-plan building featuring wooden beams and large windows in the background.

Photo looking south from the upper floor of the Tyee commons and cafeteria space.


A man in a red baseball cap gives a thumbs-up in the foreground, with a bright, modern interior featuring wooden beams and white panels in the background.

Tyee teacher Matt Setter gives a thumbs up for the new school.


Two people are sitting on a yellow ledge in front of a wall with wooden panels and colorful markings, with a gym visible in the background.

Two Tyee staff members sit in the wide windowsills overlooking the main gym, beyond the windows.


Four smiling individuals stand in front of a gymnasium wall with bleachers visible in the background.

Athletic staff and assistant principal Don Miller (second from left) pose by decorative wall with original gym floor, outside the new gyms.


Large red text reading %22WE ARE THE TITANS%22 is overlaid on a gradient background of orange and red dots, with various words in different languages scattered across the wall.

Decorative wall leading to the flexible performance space.


Rows of empty red seats with black armrests fill the foreground, while the background features a wall with horizontal wooden slats and a large window.

View of retractable seating in the performance space.


A modern, dark brick and metal building with large windows stands under a clear blue sky, with a flagpole and small trees in the foreground.

Exterior view of flexible performance space, which is the southwest corner of the new facility.