Evergreen High School: Construction Update Photos
November/December 2024
We are hard at work building your new Evergreen High School. We are on budget and on schedule to open the new Evergreen for school in September 2025.
Here are photos showcasing our construction progress in November and the first week of December.
November 7, 2024: Representative Tina Orwall (sixth from left in the photo) visited our Evergreen High School project to tour a new school construction project as well as the fire-damaged Southern Heights Site. The attendees are standing on the large learning stair in the commons.
December 5, 2024: View of pedestrian bridge connecting the two main buildings at Evergreen. This design enabled construction without impacting the major utility corridor that runs through the center of the construction site.
November 7, 2024: Interior view of music classroom at the southeast corner of new building footprint.
Assistant Principals Donell McNeal (left) and Joe Boyer (right) toured the new school in November with Principal Simón Iñiguez (center).
November 21, 2024: View of the southeast corner of the new building, with sidewalk being constructed and the bus loop on the right.
On the left: View of wood ceiling and beams in commons. On the right: View of the main entrance on the west side of the building where students arriving by car will enter.
View of the main gym.
Looking northwest, with covered waiting area leading to bus loop on right, the activities wing on the left, and the classroom wing in the distance (center).
View of library (far left windows) and covered entrance leading from the bus loop to the upper commons walkway. The classroom wing is on the upper right, with the central courtyard in the lower right.
View of a classroom interior, with partially exposed wood ceilings.
View of another classroom with built-in cabinets and windows bringing in natural light.
November 21, 2024: View from corner window overlooking the athletic field.
View of windows in commons and large learning stair with regular stairs, connecting upper and lower commons.
View from upper level of commons, with pedestrian bridge out of sight behind the viewer, entering the activities building and commons.